Unlocking next-gen solar is the key to grid reliability
William Sweet | Source: Renewable Energy World | Posted 08/30/2025

The reliability of the modern grid is, whether we realize it or not, the cornerstone of a functioning economy. And as we integrate more intermittent renewable sources, the stability of the grid depends not only on the amount of power generated but also on the resilience and diversity of the generation assets themselves, an issue recently thrust into the headlines by blackouts in Spain and Portugal. A carbon-free energy future is possible, but not without careful planning.
AI generated summary
The reliability of the modern power grid is crucial for a functioning economy, especially as we integrate more intermittent renewable energy sources. Recent blackouts in Spain and Portugal highlight the need for diverse and resilient generation assets. While a carbon-free energy future is achievable, financial barriers, particularly around the bankability and insurability of innovative solar technologies, hinder progress. The solar industry's reliance on established technologies due to stringent insurance requirements creates a feedback loop that locks out potentially superior alternatives, limiting grid modernization.
To address these challenges, targeted interventions such as performance-based insurance programs could help de-risk innovative solar projects. Successful models from Germany and the U.S. demonstrate how public institutions can provide financial guarantees that encourage private investment in renewable energy. By creating pathways for new technologies to gain insurability, we can stimulate innovation and enhance grid reliability, ultimately reducing dependence on monopolistic suppliers and fostering a more resilient energy landscape.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)09/01 - 12:00 AM
PUCT - Project No. 58479 - Net Metering Arrangements Workshop09/02 - 9:00 AM
PUCT - Project No. 58480 - Load Forecasting Workshop09/02 - 1:00 PM
PUCT - Comments Due Project No. 5819809/02 - 3:00 PM
08/30/2025
Solar leads as U.S. grid interconnection agreements grow 33%08/30/2025
The Role of Autonomous Drones in Long-Range Transmission Line Inspections08/30/2025
Ormat and Sage sign strategic agreement on Pressure Geothermal technology08/30/2025
Unlocking next-gen solar is the key to grid reliability08/29/2025
08/28/2025 TWG MeetingCY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (131 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (121 filings)
CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (108 filings)
APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (93 filings)
BROKER REGISTRATIONS - (71 filings)
APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE CYPRESS-TO-LEGEND 500-KV TRANSMISSION LINE IN HARDIN AND JEFFERSON COUNTIES - (62 filings)
INFORMATIONAL FILING OF ERCOT INTERCONNECTION AGREEMENTS PURSUANT TO SUBST. R. ยง25.195(e) - (43 filings)