Google’s new plan to keep its data centers from stressing the grid

Jeff St. John | Source: Canary Media | Posted 08/29/2025

Keyword Tags:

AI data centers are set to swamp U.S. power grids. Google’s new utility deals aim to flip the script — shifting workloads to ease strain and speed its access to energy.


AI generated summary

Google is implementing a new strategy to manage the energy demands of its data centers, particularly during peak usage times when the U.S. power grid is under stress. The tech giant has partnered with Indiana Michigan Power and Tennessee Valley Authority to create a demand response system that targets machine learning workloads, allowing Google to reduce its electricity consumption during critical hours. This initiative is significant as it represents a collaboration between data centers and utilities, which is essential for managing the rising energy costs associated with the increasing demand from AI technologies.

Historically, data centers have not been flexible in their power usage, but Google's approach could set a precedent for the industry. By agreeing to curtail power use during peak demand, Google aims to alleviate the strain on the grid and avoid the need for costly infrastructure expansions. Research indicates that there is substantial existing capacity on U.S. grids for data centers that can commit to limited power use during peak times, highlighting the potential for flexible data centers to play a crucial role in energy management and sustainability.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.canarymedia.com/articles/utilities/google-ai-data-center-flexibility-help-grid

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (132 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (123 filings)

CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (108 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (102 filings)

BROKER REGISTRATIONS - (75 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE CYPRESS-TO-LEGEND 500-KV TRANSMISSION LINE IN HARDIN AND JEFFERSON COUNTIES - (61 filings)

INFORMATIONAL FILING OF ERCOT INTERCONNECTION AGREEMENTS PURSUANT TO SUBST. R. §25.195(e) - (45 filings)