CPS Energy teams up with Seattle firm on clean hydrogen pilot project

Julianna Duennes Russ | Source: San Antonio Express News | Posted 08/11/2025

Keyword Tags:

CPS and Modern Hydrogen both said the pilot project will test the long-term feasibility of tapping into local power infrastructure. CPS is one of only a few utilities in the country testing the technology.


AI generated summary

CPS Energy is collaborating with Seattle-based Modern Hydrogen on a hydrogen pilot project aimed at transforming the city's power generation. The project involves installing a commercial-scale unit, the MH500, which will convert natural gas into clean hydrogen and solid carbon. This initiative allows CPS to explore a lower-emission fuel option while utilizing existing infrastructure. The hydrogen produced could either be used for electricity generation or blended into the utility's natural gas supply, with the carbon byproduct repurposed for asphalt in Bexar County.

The pilot project is set to begin installation in early 2026, pending site acceptance and equipment testing. CPS Energy anticipates a partnership duration of at least six years, with a focus on ensuring the project's scalability and long-term sustainability. The initiative aligns with broader emission reduction efforts and aims to leverage existing infrastructure to produce a cleaner energy source. Modern Hydrogen has previously collaborated with other utilities and has received backing from notable investors, including Bill Gates.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.expressnews.com/business/article/cps-energy-modern-hydrogen-pilot-project-20794413.php

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (127 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (115 filings)

BROKER REGISTRATIONS - (81 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE CYPRESS-TO-LEGEND 500-KV TRANSMISSION LINE IN HARDIN AND JEFFERSON COUNTIES - (58 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (46 filings)

APPLICATION OF SHARYLAND UTILITIES, L.L.C. FOR AUTHORITY TO CHANGE RATES - (43 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (39 filings)