T1 Energy picks Yates for precon work on $850M Texas plant
Zachary Phillips | Source: Construction Dive | Posted 06/19/2025

T1 Energy has found a site prep contractor for its $850 million, 5 gigawatt solar cell plant planned for Austin, Texas.
AI generated summary
T1 Energy has selected Yates Construction as the site prep contractor for its $850 million solar cell plant in Austin, Texas, which will have a capacity of 5 gigawatts. The Mississippi-based builder is expected to also serve as the general contractor for the project. T1 Energy aims to establish a domestic solar and battery supply chain, complementing its existing G1_Dallas facility, with production expected to start by the end of 2026 and the creation of up to 1,800 full-time jobs.
The project is seen as a response to the Trump administration's policies that support onshoring manufacturing, although concerns have been raised about potential tax changes that could impact the clean energy sector. T1 Energy remains optimistic about the future of solar energy and its role in meeting increasing electricity demands, emphasizing the importance of building a domestic solar supply chain.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://www.constructiondive.com/news/T1-energy-texas-solar-plant-yates/750904/
06/20 - 9:30 AM
ERCOT - IBRWG Meeting - Webex Only06/20 - 9:30 AM
ERCOT - PDCWG Meeting - Webex Only06/20 - 9:30 AM
ERCOT - TDTMS Meeting - Webex Only06/20 - 9:30 AM
06/20/2025
Interconnection shake-out: 160 GW of solar advances as 12% of projects bow out06/20/2025
Prologis Energy sells 400MW/800MWh BESS in Texas06/20/2025
Economic Eclipse: Congress Tries to Block the Sun with SEIA's Sean Gallagher & Daniel Giese06/20/2025
Prologis Energy sells 400MW/800MWh BESS in Texas06/20/2025
Could the Senate budget throw a lifeline to energy storage?APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (157 filings)
BROKER REGISTRATIONS - (75 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (50 filings)
APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (48 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (40 filings)
YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (33 filings)
CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (31 filings)