Prologis Energy sells 400MW/800MWh BESS in Texas

April Bonner | Source: Energy Storage News | Posted 06/20/2025

Keyword Tags:

Real estate platform and energy storage investor Prologis Energy has sold a 400MW/800MWh battery energy storage system (BESS) located in Alvin, Texas, US.


AI generated summary

Prologis Energy has announced the sale of a 400MW/800MWh battery energy storage system (BESS) in Alvin, Texas, strategically located in one of the most congested zones of the Electric Reliability Council of Texas (ERCOT). The project is currently under construction, with expectations for 200MW to achieve mechanical completion by the end of the year. Prologis has successfully secured land, finalized interconnection agreements, and structured a 20-year ground lease for the project, which is anticipated to benefit customers of Centerpoint Energy.

As ERCOT continues to be a leading market for battery energy storage development, concerns about electricity scarcity and price volatility are rising due to projected load growth challenges. Prologis, originally a logistics real estate company, has been expanding into renewable energy since 2007 and aims to add nine more BESS projects in Texas by the end of 2025. With over 8.5GW of grid-scale storage in development globally, Prologis is positioning itself as a significant player in the energy storage sector.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.energy-storage.news/prologis-energy-sells-400mw-800mwh-bess-in-exas/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (157 filings)

BROKER REGISTRATIONS - (75 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (50 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (48 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (40 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (33 filings)

CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (31 filings)