ARC and Nucleon to bring SMRs to Alberta and Texas
Nuclear Engineering International | Source: Nuclear Engineering Int | Posted 05/21/2025

Canada-based ARC Clean Technology and start-up Nucleon Energy have signed a memorandum of understanding (MOU) to explore the potential deployment of the ARC’s advanced small modular reactor (SMR) design – ARC-100 – at combined heat and power and power generation sites under development by Nucleon in Alberta, Canada and Texas.
AI generated summary
ARC Clean Technology and Nucleon Energy have entered into a memorandum of understanding (MOU) to explore the deployment of ARC's advanced small modular reactor (SMR) design, the ARC-100, at various power generation sites in Alberta, Canada, and Texas. This partnership aims to establish a long-term commercial relationship, potentially leading to the installation of multiple ARC-100 units across North America. The collaboration will focus on evaluating site options for the reactors and progressing towards regulatory licensing in both Canada and the United States.
The ARC-100 is a Generation IV sodium-cooled fast reactor designed for electricity and industrial heat applications, currently being developed in partnership with New Brunswick Power. The utility has already submitted a Licence to Prepare Site application to the Canadian Nuclear Safety Commission for a commercial demonstration of the ARC reactor. Both companies emphasize the importance of this partnership in advancing clean, reliable energy solutions that address power reliability and emissions reduction.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://www.neimagazine.com/news/arc-and-nucleon-to-bring-smrs-to-alberta-and-texas/?cf-view
05/21 - 9:00 AM
LEGE - House Natural Resources05/21 - 9:00 AM
LEGE - House 89th Legislative Session05/21 - 10:00 AM
LEGE - Senate Session05/21 - 11:00 AM
05/21/2025
ARC and Nucleon to bring SMRs to Alberta and Texas05/21/2025
The Chairman of Texas’ Public Utility Commission Has a To-Do List05/21/2025
CPS says it has more than enough power ready to meet summer peak demand05/21/2025
How El Paso is leading the way in water management05/21/2025
Thermal energy networks need municipal participation: reportAPPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (180 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (131 filings)
CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (122 filings)
BROKER REGISTRATIONS - (90 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (70 filings)
CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (55 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (55 filings)