GreenFire Energy demonstrates energy production from idle geothermal wells in The Geysers

Carlo Cariaga | Source: Think Geo Energy | Posted 05/13/2025

Keyword Tags:

GreenFire Energy has announced the successful launch of its first commercial next-gen geothermal demonstration project at The Geysers, the world’s largest geothermal field, at a site operated by Geysers Power Company, LLC, a wholly owned indirect subsidiary of Calpine Corporation.


AI generated summary

GreenFire Energy has successfully launched its first commercial next-generation geothermal demonstration project at The Geysers, the largest geothermal field globally. The project, operated by Geysers Power Company, LLC, has shown promising early test results using an existing geothermal well, indicating a significant improvement in geothermal recovery efficiency. This advancement highlights GreenFire Energy's capability to enhance power output in mature geothermal fields.

The system, which has been installed in a low-output well nearing idle status, is now operational, achieving sustained flow rates of 300-350 gpm and high output temperatures of 310 F. By optimizing heat recovery through natural convection and maintaining a closed-loop flow, the project aims to unlock more power from existing well infrastructure while preserving reservoir water mass. With ongoing tests validating performance across various conditions, this California Energy Commission-funded project is set to conclude in June, showcasing a promising path for the future of geothermal energy.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.thinkgeoenergy.com/greenfire-energy-demonstrates-energy-production-from-idle-geothermal-wells-in-the-geysers/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (202 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (104 filings)

BROKER REGISTRATIONS - (83 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (79 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (69 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (63 filings)

CY 2025 FIVE-YEAR REPORTS FOR LINE INSPECTION AND SAFETY UNDER 16 TAC § 25.97 (E) - (44 filings)