Vesper Energy Launches 600-MW Solar Project in Texas

Darrell Proctor | Source: Power | Posted 04/12/2025

Keyword Tags:

A Texas-based solar energy developer has inaugurated a utility-scale project in that state. Vesper Energy said the 600-MW Hornet Solar installation, which features some 1.36 million modules and covers more than six square miles in Swisher County, is now fully operational.  


AI generated summary

Vesper Energy has officially launched its 600-MW Hornet Solar project in Swisher County, Texas, marking a significant milestone in utility-scale solar energy development. The project, which includes approximately 1.36 million solar modules and spans over six square miles, was celebrated with a ribbon-cutting ceremony on April 10. Co-CEO Juan Suarez emphasized the project's role in providing reliable, domestically generated electricity, making energy more affordable, and enhancing the nation's energy security.

Construction of the Hornet Solar project began in the latter half of 2023, with Vesper securing $590 million in financing by January 2024. The project is expected to generate over $100 million in new tax revenue for Swisher County, alongside substantial investments in local schools, infrastructure, and healthcare. Additionally, it created more than 300 jobs during its construction phase, showcasing the economic benefits of large-scale renewable energy projects.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.powermag.com/vesper-energy-launches-600-mw-solar-project-in-texas/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (406 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (141 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (81 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (74 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (70 filings)

BROKER REGISTRATIONS - (65 filings)

APPLICATION OF CROSS TEXAS TRANSMISSION, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (54 filings)