Startup XL Batteries commissions first organic flow battery pilot project in Texas

April Bonner | Source: Energy Storage News | Posted 04/14/2025

Keyword Tags:

Flow battery developer XL Batteries has commissioned its first organic flow battery through a pilot project with global storage terminals provider Stolthaven Terminals.


AI generated summary

XL Batteries has launched its first organic flow battery pilot project in collaboration with Stolthaven Terminals at their Houston facility. This initiative marks the deployment of XL's long-duration energy storage (LDES) technology, aimed at generating operational data to compare its performance against traditional vanadium-based flow batteries. According to CEO Dr. Thomas Sisto, the project is not focused on scale but rather on collecting high-quality data that will facilitate a transition to commercial-scale production.

XL Batteries plans to leverage existing vanadium redox flow battery engineering to enhance its technology, with expectations of demonstrating three commercial-scale units in the near future. The company claims its organic flow battery, utilizing pH-neutral chemistry, could be more affordable than conventional options, with projected costs under $200/kWh. This partnership with Stolthaven, initiated in January 2023, aims to provide significant operational benefits, including energy storage solutions and shore power for visiting vessels, addressing the growing demand for safe and cost-effective energy storage amid rising energy concerns in the U.S.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.energy-storage.news/xl-batteries-commissions-organic-flow-battery-pilot-project-in-texas/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (411 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (146 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (91 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (79 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (70 filings)

BROKER REGISTRATIONS - (67 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (57 filings)