Dow And X-energy Submit Construction Application For Texas Advanced Nuclear Reactor Project

David Dalton | Source: NUCNET | Posted 04/02/2025

Keyword Tags:

US chemicals company Dow and advanced nuclear reactor and fuel developer X-energy have submitted a construction permit application to the Nuclear Regulatory Commission (NRC) for an advanced nuclear project in Seadrift, Texas, that could become the first grid-scale advanced nuclear reactor deployed to serve an industrial site in North America.


AI generated summary

Dow and X-energy have submitted a construction permit application to the Nuclear Regulatory Commission (NRC) for an advanced nuclear reactor project in Seadrift, Texas. This initiative aims to establish the first grid-scale advanced nuclear reactor in North America, specifically designed to provide reliable and clean power to Dow's UCC Seadrift Operations manufacturing site. The project may consist of four X-energy Xe-100 small modular reactor (SMR) units, which will replace aging energy and steam assets at the facility.

The Xe-100 is a Generation IV high-temperature gas-cooled reactor (HTGR) that has garnered interest for its efficiency and ability to produce high-temperature process heat for industrial applications. X-energy has worked closely with the NRC since 2018 to ensure the safety of the Xe-100, culminating in a comprehensive application that exceeds regulatory safety standards. If approved, construction could start later this decade, with the plant expected to be operational by 2030, significantly reducing emissions at the Seadrift site and enhancing its competitiveness.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.nucnet.org/news/dow-and-x-energy-submit-construction-application-for-texas-advanced-nuclear-reactor-project-4-2-2025

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (700 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (339 filings)

CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (97 filings)

BROKER REGISTRATIONS - (79 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (74 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (73 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (65 filings)