Lightsource bp energizes 288-MW Texas solar project portfolio

Billy Ludt | Source: Solar Power World | Posted 02/04/2025

Keyword Tags:

With this expansion, Lightsource bp’s operational fleet in Texas grows to 1.051 GW. Lightsource bp’s Texas projects have provided power during extreme weather events like winter storms Uri and Heather and recent heat waves.  


AI generated summary

A 288-MW solar project portfolio in Texas, valued at $348 million, has commenced commercial operations. This portfolio includes two utility-scale projects: the 163 MW Starr Solar in Starr County and the 125 MW Second Division Solar in Brazoria County. Together, these projects are capable of generating enough electricity to power over 50,000 homes annually, contributing to Lightsource bp's operational fleet in Texas, which now totals 1.051 GW.

Helen Brauner, interim COO for Lightsource bp USA, emphasized the importance of private investment in enhancing energy security and fostering economic growth. The projects utilize solar panels from Arizona-based First Solar and solar trackers from New Mexico-based Array Technologies, while also promoting land stewardship initiatives. These include creating pollinator-friendly habitats, integrating agriculture through sheep grazing, and enhancing wetlands to improve water quality, all aimed at preserving biodiversity and supporting local ecosystems.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.solarpowerworldonline.com/2025/01/lightsource-bp-energizes-texas-solar-project-portfolio/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (128 filings)

BROKER REGISTRATIONS - (65 filings)

Renewal of Registration for Power Generation Companies (PGCS) and Self-Generators (SGS) (Odd Numbered Registration) Under 16 TAC §25.109 (H) – 2025 - (40 filings)

CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (39 filings)

APPLICATION OF WIND ENERGY TRANSMISSION TEXAS, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (39 filings)

APPLICATION OF CROSS TEXAS TRANSMISSION, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (37 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (36 filings)