ERCOT Issues Weather Watch
ERCOT | Source: KCBD-TV | Posted 01/06/2025
(Austin, TX) ERCOT has issued a Weather Watch from January 6-10 due to forecasted cold weather across the ERCOT region, higher electrical demand, and the potential for lower reserves. Grid conditions are expected to be normal during an ERCOT Weather Watch.
ERCOT is monitoring conditions closely and will deploy all available tools to manage the grid, continuing a reliability-first approach to operations.
ERCOT encourages everyone to sign up for grid condition notifications through the Texas Advisory and Notification System (TXANS). Texans can also monitor real-time and extended grid conditions at ercot.com.
What is an ERCOT Weather Watch?
An ERCOT Weather Watch is an advance notification of forecasted significant weather with higher electrical demand and the potential for lower reserves. At this time, grid conditions are expected to be normal, and there is no current expectation of an energy emergency. Texans should continue to monitor real-time and extended grid conditions at ercot.com.
What Action is Needed?
No action is needed. You can monitor current and extended grid conditions on ercot.com.
Did You Know?
Reducing electric use during peak demand times can help you save and lower demand on the grid. Energy-saving tips can be found on the TXANS webpage.
Stay Updated
Sign up for TXANS notifications on the TXANS webpage. You can also subscribe to ERCOT Emergency Alerts, which are not sent through TXANS notifications, and download the ERCOT Mobile App for additional notifications: iOS | Android.
Media Graphics
Graphics for media use can be found here.
Source Link: https://www.ercot.com/news/release/01052025-ercot-issues-weather
01/08 - 9:30 AM
ERCOT - SSWG Meeting - Webex Only01/08 - 9:30 AM
ERCOT - WMS Meeting - Webex Only01/08 - 9:30 AM
ERCOT - ROS Meeting01/09 - 9:30 AM
01/07/2025
Meeting Summary - 01/07/2025 - RMS Meeting01/07/2025
The Year That Was: 2024 Energy Stocks - Winners And Losers01/07/2025
Canadian Solar to Deliver BESS and Solar to Sunrycer Projects in Texas01/07/2025
Texas, Utah, Last Energy challenge NRC’s ‘overburdensome’ microreactor regulations01/07/2025
Predictions: Regulations, Tech, Renewables Will Shape YearBROKER REGISTRATIONS - (67 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (51 filings)
INDUSTRIAL CUSTOMERS' NOTIFICATION UNDER PURA SECTION §39.904 (m-1) RELATING TO NON-SUPPORT OF RENEWABLE - (49 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (42 filings)
APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (34 filings)
APPLICATION OF WIND ENERGY TRANSMISSION TEXAS, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (34 filings)
CY 2024 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (27 filings)