1 - Antitrust Admonition - Diana Coleman

2 - Approval of Minutes - Vote - Diana Coleman

  • Motion to approve the September 12, 2024, PRS Meeting Minutes as presented added to the combo ballot.

3 - TAC Update - Diana Coleman

  • TAC met last month to review proposed revision requests from PRS.
  • Three proposed revision requests were approved by TAC.
  • NPRR1188: Implementation of nodal dispatch and energy settlement for CLRs.
  • NPRR1237: Retail market qualification testing requirements.
  • NPRR1244: Clarification of CLR primary frequency response responsibilities.
  • No additional comments or thoughts were shared for the TAC update.

4 - Project Update - Troy Anderson

prs_october_2024_project_update.pdf

  • The September release went live on September 26 with several RIOO items and changes to CDR reports.
  • XML implementation began October 1 related to NPRR1217; both XML and VDI will be supported until December 1.
  • SCR799 went live on October 9.
  • Upcoming changes include NPRR1205 on November 1 and TexasSET 5.0 in November around the 10th.
  • NPRR1184 planned for December regarding cash collateral procedures.
  • NPRR945 is expected to go live in December.
  • NPRR1183 moved to March 2025 and NPRR1145 planned for March concerning calculated ERCOT wide TLFs.
  • RTC+B targeted to go live on December 5, 2025.
  • NPRR965 GREDPE shutdown exemption to be integrated with RTC in late 2025.
  • Several projects deferred until after RTC due to resource constraints.
  • SCR799 implementation appreciated; a project which faced execution and resource hurdles.
  • Future planning includes tabling priorities for further review and potential cost-saving solutions.
  • Discussions about post-RTC project sequence planning emphasized.

 

5 - Review PRS Reports, Impact Analyses, and Prioritization - Vote - denotes no impact - Diana Coleman

5.1 - NPRR1180, Inclusion of Forecasted Load in Planning Analyses

  • Motion to endorse and forward to TAC the 9/12/24 PRS Report and 10/16/24 Impact Analysis for NPRR1180 carried unanimously.
    • Recommendation to approve NPRR1180, already voted last month with amendments from August 28 ERCOT comments.
    • Discussion over the impact analysis (IA), suggesting ERCOT to withdraw and reconsider it due to misalignment with NPRR language.
    • ERCOT's IA includes changes in load definitions for planning models, triggered by legislative House Bill 5066.
    • ERCOT adds new definitions (b and c) regarding independent third party load forecast and letters from TDSP officers.
    • Impact on planning studies, requiring additional resources: 11 FTEs added across RTP, RPG, and load forecasting groups.
    • Need for staff increases not solely tied to this NPRR but necessary due to system growth and legislative requirements.
    • Support for ERCOT obtaining necessary staffing, although some believe the issue should align with normal budget processes.
    • Mark Dreyfus suggests that impact analyses should strictly align with the effects of NPRRs and not broader changes, advocating review.

5.2 - NPRR1239, Access to Market Information

  • Motion to table NPRR1239 added to the combo ballot.

5.3 - NPRR1240, Access to Transmission Planning Information

  • Motion to table NPRR1240 added to the combo ballot.
    • Request to table NPRR1240 to reevaluate and potentially have revised items for November.
    • Potential to leverage NPRR1240 with an upcoming internal public API project.
    • Four-week period requested to consider factors and possibly revise items to stay on track for December board.
    • Plan to revisit and potentially come back with revised IAs next month.

5.4 - NPRR1245, Additional Clarifying Revisions to Real-Time Co-Optimization

  • Motion to endorse and forward to TAC the 9/12/24 PRS Report and 7/30/24 Impact Analysis for NPRR1245 added to the combo ballot.
    • Item originated from ERCOT.
    • Approval was voted last month with amendments from the September 5 ERCOT comments.
    • Some on-the-spot revisions were made by PRS.
    • No costs are associated with this change.

5.5 - NPRR1248, Correction to NPRR1197, Optional Exclusion of Load from Netting at EPS Metering Facilities which Include Resources

  • Motion to endorse and forward to TAC the 9/12/24 PRS Report and 8/16/24 Impact Analysis for NPRR1248 added to the combo ballot.
    • NPRR1248 presented by ERCOT as an administrative change.
    • The change captures language missed in NPRR1197.
    • The adjustment aligns with the initial intent of NPRR1197 and the PRS action taken in February.

5.6 - NPRR1249, Publication of Shift Factors for All Active Transmission Constraints in the RTM

  • Motion to endorse and forward to TAC the 9/12/24 PRS Report and 10/15/24 Impact Analysis for NPRR1249 with a recommended priority of 2026 and rank of 4740, added to the combo ballot.
    • The proposal is from Steve Reedy.
    • Unanimous recommendation for approval last month.
    • Cost impact estimated between $25,000 and $45,000.
    • Implementation duration expected to be three to five months.
    • IA deemed satisfactory.

6 - Revision Requests Tabled at PRS 

6.01 - NPRR956, Designation of Providers of Transmission Additions

  • NPRR956 is one of the oldest NPRRs and still on the list.
  • ERCOT is monitoring ongoing litigation related to Senate Bill 1938.
  • A final judicial determination on the constitutionality of Senate Bill 1938 is awaited.
  • There was discussion about whether to withdraw or redo NPRR956 upon the final decision.
  • Current intent is to keep NPRR956 tabled until further decisions are made.

6.02 - NPRR1070, Planning Criteria for GTC Exit Solutions

  • NPRR1070 is an old proposal that is still under discussion.
  • Conversations are ongoing regarding the overlap between NPRR1070 and NPRR1247.
  • There is a desire to hear from the market monitor before withdrawing or changing NPRR1070, as it was a recommendation from several years ago.
  • There is acknowledgment that although NPRR1247 might resolve some issues, there is no official endorsement of it by the market monitor.
  • Discussion has been affected by staff changes at the market monitor.

6.03 - NPRR1200, Utilization of Calculated Values for Non-WSL for ESRs

  • NPRR1200 is presented by Nextera and is an older proposal that was tabled at the WMS.
  • It is pending review by the metering working group, and the timing of their next meeting is uncertain.
  • The NPRR1200 aims to achieve similar objectives as SMOGRR28.
  • The last ERCOT board discussed SMOGRR28, and ERCOT is collaborating with market participants to develop comments for the metering working group.
  • The ERCOT board hopes to have more discussions and progress on this proposal soon.
  • It's indicated that the metering working group has not met recently as they await developmental comments.
  • There is a preference for SMOGRR28 within the group.

6.04 - NPRR1202, Refundable Deposits for Large Load Interconnection Studies

  • Discussion initiated by Lancium, highlighting comments filed by ERCOT and Longhorn Power in response to NPRR1202.
  • Revised header for NPRR1202 focuses on accelerating generation and load interconnections.
  • Bottleneck identified at the study approval stage by TDSP and ERCOT, resource integration engineers have high project loads.
  • Proposal includes charging user fees for connecting load/generation to accelerate study processes.
  • Proposed fees include a $25,000 initial charge and $5,000 quarterly fee.
  • Concerns about lack of automation within ERCOT systems and need for user-accessible project tracking.
  • Longhorn Power supportive of idea to increase discipline and certainty in project queues, with reference to higher fees at PJM as a comparison.
  • ERCOT's response highlights ongoing efforts to speed up current queue processes and address stale projects.
  • Discussion of a potential recurring fee; ERCOT not opposed but cautious about its structure due to cost justification requirements.
  • Acknowledgment of increased project activities leading to possible fee adjustments in future budget cycles.
  • Concern over ERCOT's staffing being a bottleneck; emphasis on holding ERCOT accountable for timely processing.
  • Stakeholders willing to invest to accelerate project processes, seeking solutions such as staff training or contractor use.
  • Further discussions scheduled at the WMWG meeting.

6.05 - NPRR1214, Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk

  • The item was discussed at CMWG earlier this week.
  • There were joint comments proposing adjustments to the RTO, RDPA.
  • Goal to file comments in time for WMS consideration next month.
  • There is ongoing movement and updates expected next month on NPRR1214.

6.06 - NPRR1226, Demand Response Monitor

  • Discussion held to raise awareness about NPRR1226 and its progress.
  • ERCOT provided a presentation on how stakeholders can request dashboards or website items for required information.
  • ERCOT is working on establishing an official process rather than relying on informal communications.
  • The importance of sharing ideas and information among stakeholders was emphasized.
  • Suggestions included involving the technology working group to address current constraints.
  • A meeting with the technology working group is scheduled for the 21st to discuss NPRR1226.
  • Stakeholder feedback is deemed crucial while working within ERCOT's evolving framework.
  • An update on the process is expected next month, though it may take longer internally at ERCOT.

6.07 - NPRR1229, Real-Time Constraint Management Plan Energy Payment

  • NPRR1229 originated from STEC.
  • Comments were filed after the last PRS meeting.
  • Lucas Turner filed comments to address ERCOT's request for clarifications.
  • The discussion on NPRR1229 is ongoing.

6.08 - NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater

  • ERCOT plans to file comments before the next planning working group meeting.
  • NPRR1234 is still in progress.

6.09 - NPRR1235, Dispatchable Reliability Reserve Service as a Stand-Alone Ancillary Service

  • Extensive conversation and activity since the last PRS meeting.
  • Comments filed by Luminant and Advanced Power Alliance.
  • WMS discussed the item earlier in the month but did not vote on it.
  • Three issues are currently being worked on.
  • Item is tabled at WMS for another month to allow further discussions.
  • Potential for more conversation on the topic in the following month.
  • ERCOT also provided comments on NPRR1235.

6.10 - NPRR1238, Voluntary Registration of Loads with Curtailable Load Capabilities

  • Ongoing conversations about NPRR1238.
  • Currently not ready for a vote.
  • Discussion held multiple times at OWG meetings.
  • Questions raised about minimum cap requirements and nuances of NPRR1238.
  • Encouraged the continuation of discussions at OWG.

6.11 - NPRR1241, Firm Fuel Supply Service (FFSS) Availability and Hourly Standby Fee

  • Not Discussed

6.12 - NPRR1242, Related to VCMRR042, SO2 and NOx Emission Index Prices Used in Verifiable Cost Calculations

  • Not Discussed

6.13 - NPRR1243, Revision to Requirements for Notice and Release of Protected Information or ECEII to Certain Governmental Authorities

  • There is a suggestion for either a combo ballot or a motion to approve the most recent version of NPRR1243.
  • Oncor showed support for the approval scheduled for October 14.
  • Appreciation was expressed for ERCOT legal's cooperation in finding a reasonable solution.
  • Concerns were raised about the careful implementation due to federal protections for the data.
  • Potential criminal liability related to incorrect data release was highlighted.
  • Recommendation was made to release data under the federal power act as suggested by ERCOT.
  • Comments filed on NPRR after discussions were productive.
  • Oncor appreciates the collaborative effort to ensure notification of disclosure to regulators is preserved.
  • NPRR1243 to be tabled for one more month.

6.14 - NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era

  • Motion to recommend approval of NPRR1246 as amended by the 9/20/24 ERCOT comments added to the combo ballot.
    • NPRR1246 is an alignment with the single model era, necessitating updates to terminology due to the transition from the combo model era.
    • In the single model era, Energy Storage Resources (ESR) are distinct and require their own language, unlike the combo model which shared generation resource language.
    • NPRR1246 is part of a set that includes a PGRR, a NOGRR, and an OBDR which are all addressing the alignment of ESR terminology.
    • ROS filed a request to table the NPRR1246 along with the OBDR, but PGRR and NOGRR were recommended for approval.
    • There were ERCOT comments regarding changes to voltage support service payments and other ESR terminology.
    • Discussions on policy direction and stakeholder concerns related to statutory deadlines and terminology clarity continue.
    • Discussion also raised issues of compliance and implementation for proposal 1238, focusing on ramp rate limits and responsibility for compliance.

6.15 - NPRR1247, Incorporation of Congestion Cost Savings Test in Economic Evaluation of Transmission Projects

  • ERCOT posted a draft white paper last month on NPRR1247, which received several comments.
  • The ERCOT board of directors urged moving forward with NPRR1247.
  • A special planning working group meeting is scheduled for the 29th to reach consensus before the November PRS
  • The PLWG had a lengthy discussion on NPRR1247 and scheduled an additional meeting later this month.
  • There is a possibility of submitting comments to ROS in November and revisiting the urgency request.
  • No immediate action was suggested for NPRR1247, but the aim is to expedite the process to reach the December board.

6.16 - NPRR1250, RPS Mandatory Program Termination

  • WMS voted to keep NPRR1250 tabled for another month due to ongoing work.
  • Future intent to move NPRR1250 forward for a vote prior to its termination date, emphasizing compliance with PUC rules.
  • Eric Goff from the Texas Energy Buyers Alliance is working on proposed changes to allow additional attributes on certificates, suggesting administrative benefits for keeping NPRR1250 tabled.
  • Discussions involve modifying multiple instances in the protocols, adding complexity when considering making changes simultaneously.
  • A consensus exists among some members to wait another month to resolve outstanding issues collaboratively.
  • A focus remains on working towards separate NPRRs if necessary, ensuring all changes are comprehensively addressed.

6.17 - NPRR1251, Updated FFSS Fuel Replacement Costs Recovery Process

  • Not Discussed

6.18 - NPRR1252, Pre-notice for Sharing of Some Information, Addition of Research and Innovation Partner, Clarifying Notice Requirements

  • Comments related to NPRR1252 are being prepared by Oncor for next month's PRS.
  • These comments depend on the outcome of NPRR1243, which has been tabled for one more month to allow for a thorough review.

6.19 - SCR826, ERCOT.com Enhancements

  • Not Discussed

6.20 - SCR827, Grid Conditions Graph Addition for Operating Reserve Demand Curve (ORDC) Level

  • Not Discussed

7 - Review of Revision Request Language - Vote - Diana Coleman

7.1 - NPRR1253, Incorporate ESR Charging Load Information into ICCP

  • Motion to table NPRR1253 added to the combo ballot.
    • NPRR1253 relates to incorporating ESR Charging Load information into the ICCP data set.
    • ERCOT does not currently have wholesale storage load as a value but uses ESR Charging Load as a proxy.
    • The NPRR proposes to make ESR Charging Load available via ICCP.
    • Minor edits to the protocol were suggested to ensure clarity on data types.
    • Discussion on data posting indicated data should be available on both ICCP and the ERCOT website.
    • Suggestions were made to include data posting in CSV and XML formats.
    • There is an existing CSV file containing this data, but it is hard to access.
    • A request to hold off on immediate implementation was made to confirm all stakeholders are aligned and have access.
    • Providing data via ICCP is a minor change since the data is already in ERCOT's system.
    • Additional discussions and comments are expected before moving forward with the implementation.

7.2 - NPRR1254, Modeling Deadline for Initial Submission of Resource Registration Data

  • Motion to recommend approval of NPRR1254 as submitted added to the combo ballot.
    • Introduction of the NPRR1254 to formalize the initial submission deadline for resource registration data.
    • The modification is intended to relieve ERCOT staff workload by requiring data submission a month earlier than the previous deadline.
    • This NPRR proposal targets reducing errors and providing more time for data validation.
    • The calendar change adds a new column for an additional month dedicated to review and data clean-up.
    • Concerns were raised about the potential impact on projects already under the current schedule.
    • There's acknowledgment of the urgency of the proposal while wanting to avoid impacting existing timelines.
    • Consensus on approving the NPRR1254 with the understanding that its implementation date will be decided to prevent disruption of current projects.

7.3 - NPRR1255, Introduction of Mitigation of ESRs

  • Motion to table NPRR1255 added to the combo ballot.
    • Introduction of mitigation for energy storage resources (ESR) with mitigated offer cap curves below the system-wide offer cap to prevent market power exploitation.
    • Ryan King from ERCOT provided an overview stating it's a culmination of months-long consultations involving CMWG, WMS, and TAC.
    • Proposal aims to replace the existing mitigated offer cap framework for ESRs with a 'just in time mitigated offer cap' based on specific conditions.
    • Revisions primarily affect section 4.4.9, detailing constraints for flagged ESRs and the determination of the mitigated offer cap.
    • Reviewed and refined through feedback with high-level sensitivity analysis showing minimal impact on intervals and capacity.
    • Discussion on whether NPRR1255 should be moved forward, with some support for tabling for further review of language and implications.
    • Caitlin suggests motion to table to better understand implications and check language accuracy.

8 - Other Business - Diana Coleman

  • Reminder to submit membership applications and fees as the election process begins soon.
  • Date of record is Friday, November 1, and elections start November 5.
  • Market notice will be released on October 28, a week prior to the date of record.
  • Questions about TAC affirmation letter and subcommittee letter; no changes from last year.
  • Corporate membership list is updated weekly; more frequent updates suggested closer to the deadline.
  • Requested earlier distribution of TAC qualification and employment letter examples.
  • Plans to send examples three times: after October TAC meeting, on October 28, and November 5.
  • Discussion on membership verification process and potential need for a better confirmation system.
  • PRS November and December meetings will have afternoon start times to maintain consistency.
  • Confirmation that portal notifications will inform when applications and fees are fully processed.
  • Shared experience of not receiving payment confirmation but eventually appeared on the membership list.

9 - Combo Ballot - Vote - Diana Coleman

Motion to approve combo ballot carries unamiously.

10 - Adjourn

 



Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

CY 2024 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (36 filings)

REPORT ON DISPATCHABLE AND NON-DISPATCHABLE GENERATION FACILITIES - CY2024 - (34 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (34 filings)

COST RECOVERY FOR SERVICE TO DISTRIBUTED ENERGY RESOURCES (DERS) - (33 filings)

BROKER REGISTRATIONS - (32 filings)

INFORMATIONAL FILING OF ERCOT INTERCONNECTION AGREEMENTS PURSUANT TO SUBST. R. §25.195(e) - (30 filings)

APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR APPROVAL OF A SYSTEM RESILIENCY PLAN - (30 filings)