ERCOT predicts grid stability during solar eclipse despite lower solar energy

Stephanie Becerra | Source: CBS Austin | Posted 03/29/2024

AUSTIN, Texas — Texas' electric grid operator, ERCOT, continues to reassure Texans that they do not expect any grid reliability concerns during the total solar eclipse on April 8, 2024.


AI generated summary

AUSTIN, Texas – ERCOT, Texas' electric grid operator, reassures Texans that there will be no grid reliability concerns during the upcoming total solar eclipse on April 8, 2024. ERCOT shared that the impact of reduced solar generation during the eclipse will be factored into forecasts starting on April 1 and continually updated leading up to the event.

Despite the solar eclipse passing over the ERCOT region, the operator's team has been preparing forecasting models to account for the decrease in solar power production, likening it to a sunset and sunrise occurring in the middle of the day. ERCOT emphasizes its commitment to monitoring grid conditions closely and ensuring the public remains informed throughout the process.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://cbsaustin.com/news/local/ercot-continues-to-s

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR A PROPOSED 138-KV TRANSMISSION LINE IN HARRIS AND MONTGOMERY COUNTIES - (147 filings)

APPLICATION OF AEP TEXAS INC. FOR AUTHORITY TO CHANGE RATES - (109 filings)

CY 2023 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (87 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR AUTHORITY TO CHANGE RATES - (70 filings)

APPLICATION OF LCRA TRANSMISSION SERVICES CORPORATION FOR AUTHORITY TO CHANGE RATES - (60 filings)

BROKER REGISTRATIONS - (47 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO AMEND ITS DISTRIBUTION COST RECOVERY FACTOR AND UPDATE MOBILE GENERATION RIDERS - (42 filings)