The largest battery energy storage system in the state is officially online in North Texas

by Sophia Beausoleil, KXAS-TV; Ft. Worth, TX | Source: KXAS-TV | Posted 05/23/2022

Vistra Corp announced Monday its battery energy storage facility is officially online. and can instantly release energy to the power grid.


AI generated summary

Vistra Corp has officially launched the largest battery energy storage facility in North Texas, located at the DeCordova Energy Storage Facility in Granbury. This facility features 3,000 battery modules capable of storing 260 megawatts of energy, sufficient to power approximately 130,000 homes during peak demand. The lithium-ion system is designed to store excess electricity generated during low-demand periods, primarily at night, and release it when demand surges, thereby enhancing the reliability of the power grid.

The Granbury site operates as a hybrid model, incorporating both battery storage and natural gas-powered combustion turbines, ensuring a stable energy supply even when renewable sources like wind and solar are insufficient. State Senator Nathan Johnson emphasized the importance of such innovations in meeting Texas's growing energy demands, advocating for technology-agnostic incentives to promote diverse energy solutions. Vistra's investment in this facility is part of a broader initiative to transition to cleaner energy sources while maintaining reliable electricity supply.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.nbcdfw.com/news/local/the-largest-battery-energy-storage-system-in-the-state-is-officially-online-in-north-texas/2975468/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (96 filings)

PROJECT TO DEVELOP COA AND SPCOA STATEWIDE AVERAGE SWITCHED ACCESS RATES FOR NOVEMBER 2025 PUBLICATION UNDER PURA § 52.155 AND 16 TAC § 26.223 - (88 filings)

BROKER REGISTRATIONS - (77 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (52 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE DIVISION 138-KV TRANSMISSION LINE IN TARRANT AND DALLAS COUNTIES - (49 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (43 filings)

AGGREGATOR ANNUAL REPORTS - (34 filings)