Texas Is Ready To Lead The EV Revolution
Gilbert Smith | Source: CARBUZZ | Posted 06/16/2025

According to the Texas Comptroller's office, solar power generated 14,830 jobs for Texas in 2022 alone. In 2023, Texas produced 108,000 GWh from wind power, and 32,000 GWh from solar, according to the EIA.
AI generated summary
While California is often seen as the leader in electric vehicle (EV) adoption, a recent study suggests that Texas is poised to take a significant role in the EV revolution. The study indicates that nearly half of Texans planning to buy a new car are considering an electric vehicle, a stark contrast to the national average where only about a quarter of Americans express a strong likelihood of purchasing an EV. Public support for expanding EV infrastructure is also robust in Texas, with three in four Texans favoring such initiatives, and bipartisan backing evident among both Democrats and Republicans.
However, there remains some skepticism among Texans regarding the push for EV adoption, with concerns about government overreach and the benefits skewing towards wealthier families. Additionally, many Texans feel that gas-powered vehicles are deeply ingrained in the state's culture, reflecting Texas's significant role in oil production. Despite these challenges, Texas is making strides in renewable energy, with substantial investments in solar and wind power, and is already claiming a notable share of the EV market, ranking third in the nation for electric vehicle registrations.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://carbuzz.com/texas-is-ready-to-lead-the-ev-revolution/
06/16 - 9:30 AM
ERCOT - Residential Demand Response Workshop06/16 - 9:30 AM
ERCOT - OWG Meeting - Webex Only06/16 - 9:30 AM
ERCOT - PLWG Meeting06/17 - 12:00 AM
06/16/2025
06/16/2025 Residential Demand Response Workshop06/16/2025
06/16/2025 OWG Meeting06/16/2025
06/16/2025 CMWG Meeting06/16/2025
Hithium starts manufacturing ‘world-first’ 1175Ah cell as industry ‘enters era of LDES’06/16/2025
Meeting the challenge of FERC Order 881: Why open source matters for AAR implementationAPPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (162 filings)
BROKER REGISTRATIONS - (72 filings)
APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (54 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (44 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (42 filings)
YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (34 filings)
CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (32 filings)