CenterPoint Energy prepares for active hurricane season with major infrastructure upgrades

Re'Chelle Turner | Source: Click2Houston | Posted 06/05/2025

Keyword Tags:

HOUSTON – After widespread criticism over power outages during last year’s severe weather events, CenterPoint Energy says it has made major strides to improve resiliency and better serve customers this hurricane season.


AI generated summary

CenterPoint Energy has taken significant steps to enhance its infrastructure and improve service reliability ahead of the upcoming hurricane season, following widespread criticism over power outages during severe weather events last year. The company faced backlash after a derecho and Hurricane Beryl caused extensive outages, prompting a formal review by the Public Utility Commission of Texas. In response, CenterPoint launched the Greater Houston Resiliency Plan, completing major upgrades in less than nine months, including the installation of 25,000 fiberglass power poles and the burial of 400 miles of power lines.

Additionally, CenterPoint has implemented advanced technology, such as 4,500 automation devices known as TripSavers, which can automatically restore power after temporary faults. The utility has also established its own weather system with 100 industrial-grade weather stations to provide real-time data for better storm response. With an above-average hurricane season predicted, CenterPoint aims to restore customer confidence by improving communication during outages and providing timely updates on power restoration timelines.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.click2houston.com/news/local/2025/06/03/centerpoint-energy-prepares-for-active-hurricane-season-with-major-infrastructure-upgrades/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (164 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (113 filings)

BROKER REGISTRATIONS - (81 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (64 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (47 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (44 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (37 filings)