AT&T Signs PPA For Output From New 130-MW Texas Solar Farm

Darrell Proctor | Source: Power | Posted 06/05/2025

Keyword Tags:

Enbridge, a Calgary, Alberta, Canada-based energy group, on June 4 marked the start of operations for the 130-MW Orange Grove Solar installation near Corpus Christi. The array is Enbridge’s first in Texas. The company on Wednesday said Dallas-headquartered AT&T has a long-term virtual PPA for the project, which helps offset the company’s energy costs and supports its carbon-reduction goals.


AI generated summary

AT&T has entered into a power purchase agreement (PPA) for a new solar power project in Texas, specifically the 130-MW Orange Grove Solar installation near Corpus Christi, which is operated by Enbridge. This marks Enbridge's first solar project in Texas, and the PPA will help AT&T offset energy costs while supporting its carbon-reduction initiatives. The company primarily relies on solar and onshore wind virtual PPAs for its renewable energy needs and is actively seeking to enhance its on-site renewable energy sources.

Enbridge's executive vice president, Matthew Akman, emphasized the importance of delivering zero-emission electricity to support economic growth and energy demand in Texas. The Orange Grove site spans 920 acres and is equipped with approximately 300,000 solar panels. Enbridge also announced plans for a larger solar farm, the 815-MW Sequoia Solar installation, which will be among the largest in the U.S. This project highlights the collaborative effort of local communities, landowners, and officials in bringing the solar initiative to fruition.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.powermag.com/att-signs-ppa-for-output-from-new-130-mw-texas-solar-farm/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (164 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (113 filings)

BROKER REGISTRATIONS - (81 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (64 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (47 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (44 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (37 filings)