ACP Tallies 7.4 GW of New Solar, Storage, Wind

John Cropley | Source: RTO Insider | Posted 05/31/2025

Keyword Tags:

ACP said in a report released May 29 that this was the second-strongest start to a year ever recorded in the United States and brought the total to 320.86 GW installed nationwide. 


AI generated summary

The American Clean Power Association (ACP) reported a significant increase in installed utility-scale solar, wind, and storage capacity, totaling 7.4 GW in the first quarter of 2025. This marks the second-strongest start to a year in U.S. history, bringing the national total to 320.86 GW. Despite potential federal policy changes that could complicate renewable energy development, the announced pipeline of projects grew by 12% compared to the previous year, reaching 184.4 GW, which represents a potential investment of $328 billion.

ACP President Jason Grumet emphasized the importance of the clean energy sector for the economy and energy needs, highlighting the necessity for consistent investment signals amidst political uncertainties. The report detailed that the new capacity included 4.46 GW of solar, 1.6 GW of storage, and 1.33 GW of wind, with Texas leading in clean power installations. However, challenges remain, particularly for projects still in development, as evidenced by a recent report indicating $14.5 billion in canceled clean energy investments in early 2025.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.rtoinsider.com/106634-acp-tallies-74gw-new-solar-storage-wind/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (120 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (110 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (84 filings)

BROKER REGISTRATIONS - (82 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (46 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (43 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (38 filings)