ROUNDUP: Habitat Energy in Texas, FlexGen EMS updates, Nuvve’s new subscription service

April Bonner | Source: Energy Storage News | Posted 04/10/2025

Keyword Tags:

A news roundup focusing on optimisation specialist Habitat Energy’s recent moves in the industry, FlexGen’s new energy management system feature and a newly announced battery subscription service from Nuvve.


AI generated summary

Habitat Energy has announced its plans to optimize Eni Plenitude's Guajillo battery energy storage system (BESS) in Texas, which has a capacity of 200MW/200MWh. The BESS, located in Webb County alongside a solar farm, is expected to be operational by mid-2025. Habitat Energy aims to maximize revenue through advanced algorithmic price forecasting and human oversight, claiming to manage over 1.2GW of battery storage and renewable assets in the ERCOT region. The company recently signed an agreement with Octopus Energy US for further optimization services.

FlexGen Power Systems has introduced a new battery health feature in its HybridOS energy management system, which provides a more accurate view of battery degradation for long-term planning. This feature continuously evaluates energy flow during charge and discharge events to compute a site-specific degradation curve. Meanwhile, Nuvve has launched a 'Battery-as-a-Service' program aimed at electric cooperatives, allowing for scalable BESS deployment without significant upfront costs. This subscription-based service is expected to begin deployments in late 2025 and is designed to enhance profitability for Nuvve, which has faced challenges in its financial performance.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.energy-storage.news/roundup-habitat-energy-flexgen-ems-nuvves-subscription/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (376 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (86 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (81 filings)

BROKER REGISTRATIONS - (69 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (68 filings)

APPLICATION OF CROSS TEXAS TRANSMISSION, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (58 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (56 filings)