Coal-fired power plant south of S.A. switching to solar after receiving $1.4 billion federal grant
Richard Brack | Source: San Antonio Express News | Posted 12/23/2024

A South Texas electric cooperative is converting its heavily polluting coal-fired power plant and mines to a solar and battery facility.
AI generated summary
A South Texas electric cooperative, San Miguel Electric Cooperative, is transitioning from a coal-fired power plant to a solar and battery facility with the help of a $1.4 billion grant from the U.S. Department of Agriculture. This move is part of a larger initiative to support clean energy and rural jobs, with the new facility set to have 600 megawatts of capacity to provide power to 47 counties across rural South Texas.
This transition to solar energy will significantly reduce pollution, specifically cutting more than 1.8 million tons of climate change pollution annually and stopping the accumulation of coal ash. The decision is praised for its positive impact on water quality and environmental health in the region, with local officials expressing optimism about the clean energy future and the importance of eliminating greenhouse gas emissions while ensuring reliable power for rural communities.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://www.expressnews.com/business/article/coal-power-plant-solar-battery-conversion-texas-19995155.php
06/23 - 8:30 AM
ERCOT - HR and Governance Committee Meeting06/23 - 9:30 AM
ERCOT - RTCB Market Trials Weekly Webex06/23 - 10:00 AM
ERCOT - Finance & Audit Committee Meeting06/23 - 11:00 AM
06/21/2025
RMR Costs Soar06/21/2025
The Permian Basin is Fueling America's Electric Future06/21/2025
Texas Railroad Commission shuts down defiant Houston oil field operator after third earthquake06/21/2025
High Demand Expected for Another Hotter Than Normal Summer06/20/2025
06/20/2025 PDCWG MeetingAPPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (153 filings)
BROKER REGISTRATIONS - (80 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (48 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (44 filings)
APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT THE HALLSVILLE NATURAL GAS PLANT IN HARRISON COUNTY, TEXAS AND CONVERT WELSH POWER PLANT UNITS 1 AND 3 TO NATURAL GAS - (33 filings)
CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (33 filings)
YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (32 filings)