Coal-fired power plant south of S.A. switching to solar after receiving $1.4 billion federal grant

Richard Brack | Source: San Antonio Express News | Posted 12/23/2024

Keyword Tags:

A South Texas electric cooperative is converting its heavily polluting coal-fired power plant and mines to a solar and battery facility. 


AI generated summary

A South Texas electric cooperative, San Miguel Electric Cooperative, is transitioning from a coal-fired power plant to a solar and battery facility with the help of a $1.4 billion grant from the U.S. Department of Agriculture. This move is part of a larger initiative to support clean energy and rural jobs, with the new facility set to have 600 megawatts of capacity to provide power to 47 counties across rural South Texas.

This transition to solar energy will significantly reduce pollution, specifically cutting more than 1.8 million tons of climate change pollution annually and stopping the accumulation of coal ash. The decision is praised for its positive impact on water quality and environmental health in the region, with local officials expressing optimism about the clean energy future and the importance of eliminating greenhouse gas emissions while ensuring reliable power for rural communities.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.expressnews.com/business/article/coal-power-plant-solar-battery-conversion-texas-19995155.php

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (322 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (87 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (82 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (80 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (71 filings)

BROKER REGISTRATIONS - (65 filings)

CY 2025 FIVE-YEAR REPORTS FOR LINE INSPECTION AND SAFETY UNDER 16 TAC § 25.97 (E) - (55 filings)