Massive 1-Gigawatt Virtual Power Plant Created From Thin Air

Tina Casey | Source: CleanTechnica | Posted 11/09/2024

Keyword Tags:

Everything is bigger in Texas, and that includes virtual power plants. A virtual power plant deploys smart technology to enlist individual ratepayers in grid stability and resiliency efforts. 


AI generated summary

Virtual power plants are gaining momentum in Texas, with a 1-gigawatt initiative involving NRG Energy, Google Cloud, and Renew Home. These innovative power plants utilize smart technology to engage individual ratepayers in grid stability efforts, potentially saving costs on new power plant construction. Texas, with its strained grid and abundant wind and solar resources, makes an ideal location for such developments. Smart thermostats will play a crucial role in this project, with NRG planning to distribute hundreds of thousands of them for free to participating homes.

As this Texas-sized virtual power plant takes shape, it marks a significant step towards enhancing grid resiliency and leveraging renewable energy sources. The collaboration between key players in the field demonstrates a commitment to transforming energy management and empowering consumers to make informed choices. With plans to expand the initiative to include electric vehicle batteries and home energy storage devices, the virtual power plant model is poised for further growth beyond Texas, potentially impacting energy infrastructure nationwide.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://cleantechnica.com/2024/11/08/massive-1-gw-virtual-power-plant-created-from-thin-air/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

JOINT APPLICATION OF THE CITY OF SAN ANTONIO, ACTING BY AND THROUGH THE CITY PUBLIC SERVICE BOARD (CPS ENERGY), AND SOUTH TEXAS ELECTRIC COOPERATIVE, INC. (STEC) TO AMEND THEIR CERTIFICATES OF CONVENIENCE AND NECESSITY FOR THE PROPOSED HOWARD ROAD-TO-SAN MIGUEL 345-KV TRANSMISSION LINE IN BEXAR AND ATASCOSA COUNTIES - (159 filings)

APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR APPROVAL OF A SYSTEM RESILIENCY PLAN - (76 filings)

CY 2024 POWER MARKETER RE-REGISTRATION PURSUANT TO 16 TAC 25.105 (D) - (52 filings)

BROKER REGISTRATIONS - (41 filings)

CY 2024 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (35 filings)

CY 2024 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (32 filings)

IDENTIFYING TRANSMISSION SERVICE PROVIDERS FOR IMPLEMENTING THE PERMIAN BASIN RELIABILITY PLAN - (31 filings)