Energy Vault Announces FID Approval for 57 MW Cross Trails Battery Energy Storage System in Texas and 10-Year Offtake Agreement with Gridmatic

Business Wire | Source: 01Net. | Posted 11/09/2024

Keyword Tags:

Cross Trails BESS to provide energy and ancillary services to support renewable energy production and improve grid resiliency in the Electric Reliability Council of Texas (ERCOT) region


AI generated summary

Energy Vault, a sustainable energy storage solutions leader, has announced plans to deploy a 57 MW/114 MWh Battery Energy Storage System (BESS) in Texas and sign a 10-year offtake agreement with Gridmatic. This deployment in Scurry County is part of Energy Vault's strategy to provide energy and ancillary services to support renewable energy production and improve grid resiliency in the ERCOT region, with construction expected to begin in Q1 2025.

The offtake agreement with Gridmatic marks a significant step in Energy Vault's growth strategy to invest in financially attractive and long-term energy storage infrastructure projects. This partnership will leverage Gridmatic's AI-based forecasts to optimize trading results in the ERCOT market. With a focus on maximizing capital efficiency and profitability, Energy Vault aims to continue capitalizing on emerging opportunities in the energy storage market while delivering sustainable energy solutions for the ERCOT region.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.01net.it/energy-vault-announces-fid-approval-for-57-mw-cross-trails-battery-energy-storage-system-in-texas-and-10-year-offtake-agreement-with-gridmatic/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

JOINT APPLICATION OF THE CITY OF SAN ANTONIO, ACTING BY AND THROUGH THE CITY PUBLIC SERVICE BOARD (CPS ENERGY), AND SOUTH TEXAS ELECTRIC COOPERATIVE, INC. (STEC) TO AMEND THEIR CERTIFICATES OF CONVENIENCE AND NECESSITY FOR THE PROPOSED HOWARD ROAD-TO-SAN MIGUEL 345-KV TRANSMISSION LINE IN BEXAR AND ATASCOSA COUNTIES - (159 filings)

APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR APPROVAL OF A SYSTEM RESILIENCY PLAN - (76 filings)

CY 2024 POWER MARKETER RE-REGISTRATION PURSUANT TO 16 TAC 25.105 (D) - (52 filings)

BROKER REGISTRATIONS - (41 filings)

CY 2024 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (35 filings)

CY 2024 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (32 filings)

IDENTIFYING TRANSMISSION SERVICE PROVIDERS FOR IMPLEMENTING THE PERMIAN BASIN RELIABILITY PLAN - (31 filings)